The recent post about Castlegate failed to mention that it is in the process of being part-pedestrianised, Phase 2 of Sheffield’s ‘Grey to Green’ project. Unless you visit this forgotten part of the city centre the relevance of the initiative might escape you.

It is part of an approach to transform ‘redundant’ road space into a network of public spaces, sustainable drainage and urban rain gardens, which aims to improve the setting of the Riverside Business District, Castlegate and the rest of the city centre and then on to Kelham Island and Victoria Quays, as a place to work, live and enjoy, whilst also dealing with the effects of climate change.

Phase 1 (West Bar/Bridge Street/Snig Hill) was completed in Spring 2016 and was funded by the European Regional Development Fund, Sheffield City Region Infrastructure Fund and Sheffield City Council.

The area suffered catastrophic river floods in 2007. With the completion of the Inner Relief Road in 2008, traffic was diverted away from West Bar. The opportunity was seized to replace the ‘grey’ impermeable ‘redundant’ roads into ‘green’ permeable beds, transforming the space with colourful meadow-like planting and significantly increasing surface water storage.

With advice on plant selection from the University of Sheffield Landscape Department this has created a new townscape that is different to anything done in Sheffield before. Over 40,000 bulbs, 40 new trees, 600 evergreen shrubs and 26,000 herbaceous plants were introduced to form a seasonal urban meadow.

The new road layout was designed to slow vehicle speeds and make walking and cycling more attractive. New paving, street furniture, colourful seating and five eye-catching  public art ‘totems’ celebrate the local history of the West Bar area including its Victorian music halls and theatres, its lively street life, its complex relationship to the river and its legacy of industry and brewing.

Phase 2 (Castlegate to Exchange Place) is nearing completion, and Phase 3 (Gibraltar Street  to Shalesmoor) will eventually transform 1.2km of ‘redundant’ road-space into an attractive new linear green public space.

© 2020 David Poole. All Rights Reserved.

Categories
Streets

Castlegate

The name suggests that this is one of Sheffield’s ancient roads, perhaps named after Sheffield Castle, this stronghold destroyed by Parliamentarians during the 1600s. Castlegate is the road that runs alongside the River Don between Blonk Street and the junction of Waingate and Bridge Street.

However, you might be surprised to know that Castlegate is a relatively modern road and celebrates its centenary in 2030.

The road is found on the site of the lost castle and was first suggested by Edward Mitchel Gibbs, the Sheffield architect, as part of his ambitious plans for a Viaduct Scheme connecting Great Central Station (Victoria Station) with Haymarket.

The River Don Road was the only portion of the proposal adopted by Sheffield Corporation and built to ease congestion around Blonk Street, The Wicker and Lady’s Bridge. Its construction was made easier by the council’s Castle Hill Market development built on the embankment of the castle.

Castlegate (or Castle Gate), 60 feet wide and 200 yards long, was built at a cost of £13,000 in 1930, using over 9,000 tons of material, with a one-foot layer of strong concrete laid below the asphalt.

It was divided from the River Don by an old stone wall which had to be reinforced by 14 concrete buttresses each weighing 50 tons. Over the buttresses was a solid mass of concrete stretching from the wall halfway under the road and taking the weight of the traffic.