“One side of the city centre to the other, and less than a mile. By car, I travelled 2.5 miles.”

The best map of Sheffield’s Inner Ring Road, but spoilt by spelling mistakes.

An unusual post, in so much that we are looking at a road. In fact, a series of roads that form one big one – Sheffield Inner Ring Road.

We might live in Sheffield, but sometimes it’s difficult to see wood for the trees, and this is the case with the inner ring road, because you probably don’t realise its purpose and where it is.

Let’s start in the 1930s when a route around the city centre was first proposed. Truth be known, World War Two stalled plans until the sixties, and in 1969 Sheffield Corporation published an impressive handbook called ‘Sheffield – Emerging City,’ in which plans for a detailed road system were revealed for the first time.

The council intended to pour £65m into the scheme which included bus lanes, pedestrian areas, as well as an urban motorway and motorway links with the M1.

Robert Waterhouse, writing in The Guardian in 1972, said that “Sheffield was as proud of its new roads as of its housing, its clean air, and its flourishing arts. They were all symbols of rebirth after years of stagnation among the ruins of the Industrial Revolution.”

The Guardian article, long forgotten, provides an interesting snapshot into the arguments that raged at the time.

It pointed out that after 1969, things had started to go wrong. In May 1971, a joint report by the city engineer, the city planning officer and architect, and the general manager of the transport department, had taken a gloomy view.

‘Although a large highway construction programme has been embarked upon,’ it said, ‘the growth of vehicular traffic is much greater than the growth of road capacity. The disparity has been obvious for many years and there seems negligible hope of it being ended in the foreseeable future.”

The report estimated that the proposed highway system, capable of carrying about 50 per cent of commuters to work by car, would cost ratepayers another 20p in the pound, which was probably acceptable, but that a system by which nearly everyone went by car could cost £300m, or another pound on the rates, clearly unacceptable. If the ‘compromise,’ £65m system was going to get clogged up anyway, was it worth building at all?

Arundel Gate in 1973 looking towards the Hole in the Road – new barriers erected in attempt to make pedestrians use the subways. Image: Sheffield Newspapers/Picture Sheffield

Waterhouse identified growing opposition within the council.

Sir Ron Ironmonger, Labour’s council leader, admitted that a growing number of councillors were against the scheme, and there had been public exchanges between the planning department and engineers.

The planners, headed by R. Adamson, felt that the engineers were going about the job the wrong way: instead of giving priority to the inner ring road, which everybody thought essential, construction had been advanced near the city centre. This meant that the civic circle – the inner ring road ultimately intended to carry only local shoppers and delivery vans – was being used as a throughway.

But the engineers, under K.D. Wiilliams,  replied that highways the size of the inner ring road – a six-lane urban motorway – didn’t happen overnight.

It seemed that Sheffield residents didn’t know what they were in for but would soon find out. The new interchange between the inner ring road and the Parkway was near completion at the bottom of Commercial Street. Sheffield Parkway was also being built and would be the main route into the city centre from the M1.

Construction of Sheffield Parkway in 1974 looking towards Park Square. Image: Sheffield Newspapers/Picture Sheffield
Sheaf Street/Commercial Street (latterly known as Park Square) roundabout under construction in 1973. Image: Sheffield Newspapers/Picture Sheffield

But the argument in 1971 was that traffic coming into the city centre was being diverted onto newly-constructed roads, because there was no proper inner ring road. And it was causing problems.

On Commercial Street itself, a bridge was being widened to take four lanes of traffic. It joined the civic circle at Castle Square, where traffic and pedestrians were already separated – cars at ground level, pedestrians underground. But before the road got there, it had to pass Fitzalan square, one of the principal routes for shoppers on foot. Everybody agreed this was a problem, but work on widening Commercial Street continued anyway, despite open criticism from Labour councillors.

Widened Commercial Street in 1970s, looking towards the Gas Company Offices on right, Electricity Supply Offices and Barclay’s Bank on left. Shude Hill behind car park on right. Image: Picture Sheffield

There were others also opposed to the scheme. Dr Leonard Taitz, a young South African doctor, working in Sheffield, was convener of the Conservation Society’s national transportation working party. He had started a campaign to bring the road building programme to a halt while a new policy on integrated transportation was formulated.

New roads were being built within the city centre but there were design flaws.

He cited the case of Furnival Gate, also a four-lane highway which, he suggested, was bound to be used by commuter traffic, but which divided The Moor and Pinstone Street, two proposed precinct streets. A subway to take people under the road had already been built, while Charter Row, another radial, had a barrier down its middle which cut a whole segment of the city from the centre.

Furnival Gate at the junction with The Moor showing (middle left) junction with Union Street in the 1960s. Image: Picture Sheffield

He argued that these roads were primarily being used by commuters cutting across town. But Mr K.D. Williams, head of technical design at the engineers, said this wasn’t the case, and that they were a necessary part of an integral system, that will one day be blocked off to prevent through traffic, and channel motorists to off-street car parks.

Whatever the interpretation, the roads were ‘not a pretty site.’ Certainly not ‘Sheffield’s Champs Elysees,’ as a councillor had called Arundel Gate.

Robert Waterhouse asked the important question? Would the new roads ever carry the massive traffic that Sheffield had come to expect? Would the inner ring road be built as a motorway, and would Sheffield get its two, or even three, motorway links with the M1?

Sir Ron Ironmonger pointed out that after 1974, highways would become the responsibility of the new South Yorkshire metropolitan authority and had no wish to make any drastic moves at such a late stage, and cited Nottingham which had done away with  a major part of its road programme. (Sir Ron later became leader of South Yorkshire Metropolitan County Council).

What did happen?

The 1970s proposal for the Inner Ring Road was abandoned because it would have destroyed important heritage assets like Kelham Island and the canal basin, and cash, as ever, was the stumbling block. But we did eventually get an Inner Ring Road, but it took a long time for it to be completed in its entirety. 

We can thank Duncan Froggatt, a Chartered Engineer, in his excellent book, ‘Sheffield – A Civilised Place’ (2018), for providing the timeline.

“The inner relief road had started in the 1960s starting with the dualling of Netherthorpe Road. But the later stages came much later with St Mary’s Gate and Hanover Way widened to dual carriageways in the 1980s.

“Sheaf Street was improved in the early 2000s leading to the improvement of Sheaf Square and subsequently links to St Mary’s Road up to 2009.

“The northern section from Sheffield Parkway to Penistone Road was built in two phases in the 1990s. The phase from the Parkway to The Wicker was completed in 2000, originally called Cutlers’ Gate, but later renamed Derek Dooley Way. The next stage, between the Wicker and Shalesmoor was finished in 2008.

“Once completed, it provided a continuous loop of dual carriageway, clockwise from Granville square in the southeast to Sheffield Parkway in the east, linking all main arterial routes in the city.”

Netherthorpe Road with Netherthorpe Street Flats under construction in 1965, looking towards Netherthorpe High Rise Flats. Image: SCC/Picture Sheffield

All done and dusted, but these days it is what is  happening within the Inner Ring Road that creates the interest.

Mr Williams’ plan for streets to be blocked off to traffic within the city centre did and continues to happen. Fargate and The Moor were the first to be pedestrianised, Pinstone Street is in transition, and Arundel Gate will be downgraded.

But what nobody in the 1970s envisaged was something that had been around for centuries… and that was the bicycle. Cycle routes, and the eagerness to cut car emissions, while greening our urban spaces, means that Sheffield city centre will eventually change beyond recognition.

I leave you with a story. Last week, I had to travel by car from one side of the city centre to the other. By foot it was less than a mile. By car, I travelled 2.5 miles.

Derek Dooley Way. Image: Sheffield Star

“Driving into Sheffield, I was looking forward to my friend’s hen-do. We had booked a city centre apartment, a spa day and a restaurant. What could go wrong? Yet, an hour-and-a-half later, I was bellowing tearfully into my mobile at my boyfriend: “You came to university here. Where AM I?” What had caused this emotional meltdown? Certainly not a fall-out with my friends – I hadn’t even seen them yet. Instead, my fun-filled city break had been spent navigating a series of roundabouts on the city’s ring road which kept spitting me out with increasing ferocity. Sheffield’s inner ring road has been tormenting drivers since 1961. Like many of the nation’s worst ring roads, it twists you round its little finger only to catapult you into bus-only zones or roads that lead you off in the opposite direction to the one you need.” – Jenny Scott – BBC News – 2014

NOTE
Robert Waterhouse is a journalist. Starting on the Guardian in Manchester and London, he turned freelance and was launch editor of the daily North West Times. He is a co-editor of the review Mediterraneans. His books include The Other Fleet Street, a history of national newspaper publishing in Manchester.

©2022 David Poole. All Rights Reserved.

Categories
Buildings

The Electricity Substation referred to as a “citadel” when it was built 

Electricity Substation, at the junction of Moore Street and Hanover Way. Built 1968. Photograph: DJP/2021

Here’s a building that attracts attention from all over the world. Strangely enough, it is a building that frightened me as a child. The cold, harsh, concrete structure overpowers one of the main gateways into Sheffield city centre.

Do we like it?

It seems that disapproval of Sheffield’s Brutalist architecture is reserved for Park Hill flats, and the Electricity Substation, on Moore Street and Hanover Way, seemingly escapes most criticism. And since October 2010, the building has been floodlit with coloured lighting at night-time creating a dramatic artistic focal point on Sheffield’s ring road.

Its history goes back to the early 1960s when electricity distribution in the city called for the use of a 275 kilovolt cable ring around the city centre with transformer and switching substations needed on the ring.

A substation was needed near the junction of The Moor and Ecclesall Road. Back then, this was an area largely occupied by substandard back-to-back housing and small cutlery works and was identified for redevelopment.

The original plan was square in detail, but this was rejected because it would have forced the closure of several small factories. Instead, an L-shaped plan, occupied by back-to-back properties, was devised by the Central Electricity Generating Board (CEGB) to be built in two phases.

The chosen site needed an architectural statement and the CEGB appointed Jefferson, Sheard and Partners of Sheffield and London, led by Bryan Jefferson, as architects to work with the board’s own civil engineer.

The result was this concrete building that housed transformers, switchgears, and busbars on separate floors. Phase 2, forming the other leg of the substation was never built because anticipated demand never materialised.

Vertical circulation is via an external staircase with covered walkway. Photograph: DJP/2021

The Electricity Substation was built by Longden & Sons and completed in 1968. In the same year, it was commended in the Financial Times Industrial Architecture Awards.

Constructed with a reinforced concrete frame with concrete floor slabs, blue engineering facing bricks, and cladding panels of Cornish granite aggregate, it was completed by Longden & Sons in 1968. In the same year, the building was commended in the Financial Times Industrial Architecture Awards.

The ground floor houses two transformers, with switch gear occupying the floor above. It was Grade II listed in 2013, considered to be of special interest, and is still in use, although advanced technology means the second floor is redundant.

Exposed concrete panels are on the upper levels and are illuminated at night. Photograph: DJP/2021

Note: –
Bryan Jefferson founded his practice with Garry Sheard in 1958, and the architects were also responsible for the Cinema and Entertainment complex in Pond Street, now occupied by Odeon Luxe, Tank Nightclub, and the O2 Academy.

The substation is highly unusual for its date as due to its prominent urban position in a post-war redevelopment area the transformers and switchgear are enclosed within an architect-designed building, rather than being located in an open-air site surrounded by security fencing as was the usual form for substations of this period. Photograph: DJP/2021